Oil & Gas Cos. Project's Costs Up By 30% Due To Rigs Shortage ... - Webnewswire.com

| | TrackBacks (0)
--> Oil exploration and production companies are not only facing acute shortages of drilling rigs by over 60% but also suffering from a crunch of skilled personnel to an extent of 30% which has resulted into inordinate delays of their hydrocarbons discovery schedule, with projects cost exceeding about 30% in last 3-4 years.

Track Mounted Cone Crusher Manufacturer website and info.

The aforesaid inferences are drawn in a Paper on `Indian Oil & Gas Sector : An Overview’, brought out by ASSOCHAM, further highlights that mismatch between demand of drilling rigs and their supplies on one hand and shortages of skilled personnel against their demand for oil and gas exploration if not addressed urgently, India’s crude import will go up by 20%. Currently, 70% of India’s petroleum, oil & lubricant (POL) requirements are met through imports which might go up to 90% by 2010, warns the Paper.

Full Story: Oil & Gas Cos. Project's Costs Up By 30% Due To Rigs Shortage ... - Webnewswire.com

0 TrackBacks

Listed below are links to blogs that reference this entry: Oil & Gas Cos. Project's Costs Up By 30% Due To Rigs Shortage ... - Webnewswire.com.

TrackBack URL for this entry: http://www.auto-fueltanks.com/cgi-bin/mt/mt-tb.cgi/6349

About this Entry

This page contains a single entry by Viraj published on May 16, 2009 7:36 PM.

'Indian seabeds may have huge oil, gas deposits' - Times of India was the previous entry in this blog.

Testudo Oil & Gas to buy Batoche Energy for $2.1 million - The Canadian Press is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.