RIL's gas output may be 4 times the estimate - Business Standard

| | TrackBacks (0)
The D-6 fields of Reliance Industries in the Krishna-Godavari (KG) Basin have the potential to produce gas that is over four times the estimated peak output of 80 million cubic metres a day (mmscmd).

Track Mounted Cone Crusher Manufacturer : http://www.shaktimining.com/track-mounted-cone-crusher-manufacturer.html

VK Sibal, director general, directorate-general of hydrocarbons, told Business Standard, "The 50 wells in D-6 were earlier estimated to produce a total of 80 mmscmd gas (at the rate of 1.6 mmscmd per well). However, each well can produce about 6 to 7 mmscmd, so you can estimate the potential.” Sibal said that the government was usually conservative in approving the proven reserves as the exact potential could be ascertained only after actual production starts. Sibal had said earlier that 18 wells had been drilled in the D-1 and D-3 gas fields in the D-6 block, but only eight had been opened, while testing was going on at two wells.

Full Story: RIL's gas output may be 4 times the estimate - Business Standard

0 TrackBacks

Listed below are links to blogs that reference this entry: RIL's gas output may be 4 times the estimate - Business Standard.

TrackBack URL for this entry: http://www.auto-fueltanks.com/cgi-bin/mt/mt-tb.cgi/8570

About this Entry

This page contains a single entry by Viraj published on September 21, 2009 8:36 AM.

Oil India IPO subscribed 31 times; QIBs bid the most - Economic Times was the previous entry in this blog.

Iran eyes launch of gas deal with Switzerland: official - Xinhua is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.